Jaewon Electric Vehicle Battery Facility

Industrial / Manufacturing | 300,000+ SF | 10-Month Timeline | 2025 ABC Award of Merit Project Overview Steinberger Construction partnered with the project team behind the Jaewon Electric Vehicle Battery Facility in Kokomo, Indiana—a high-priority initiative supporting the growth of EV manufacturing infrastructure in the U.S. The scope included the delivery of a six-building campus […]
Donaldson Warehouse Project

2020 Award of Excellence in Construction | Pre-Engineered Metal Building | 169,000 SF | 18-Month Timeline Project Overview To meet growing demand for air filter products, Donaldson Company required a significant expansion to its Frankfort manufacturing facility. Steinberger Construction was awarded a design-build contract based on the owner’s outline specifications and a tailored concept developed […]
Polymer Science 50K SF (2024 Award Winner)

Industrial / Manufacturing | 50,000 SF | 2024 Award of Excellence | 8-Month Timeline Project Overview Steinberger Construction partnered with Polymer Science to complete a significant 50,000-square-foot expansion of their Monticello, Indiana facility. Designed and built to meet specialized operational requirements, this industrial/manufacturing project included two Butler pre-engineered building additions, each tailored for performance, durability, […]
CAT Steam Project

Energy, Industrial / Manufacturing | 1,500+ LF Steam System | 3-Month Timeline Project Overview Steinberger Construction was engaged by Caterpillar to deliver a high-priority steam infrastructure replacement at its Lafayette facility—an upgrade that transitioned the site from a failing underground system to a new, above-ground configuration engineered for reliability, safety, and maintainability. The project involved […]
Andersons Ethanol

Energy, Industrial / Manufacturing | 100,000+ SF | Multi-Phase Delivery Project Overview Steinberger Construction has served as a trusted partner to Andersons, delivering a series of ethanol production facilities across multiple locations. Each site was designed and constructed to meet the complex demands of large-scale energy production—balancing performance with regulatory compliance, and adaptability with long-term […]
Frito Lay

Agriculture / Food, Industrial / Manufacturing | Multi-Phase Program | Food-Grade Facility Project Overview Steinberger Construction partnered with Frito-Lay to deliver a series of high-impact infrastructure upgrades and facility expansions at their Frankfort, Indiana manufacturing plant. Each project was strategically developed to support production capacity, enhance operational flow, and meet the strict standards of a […]
Bayer/Monsanto

Agriculture / Food, Industrial / Manufacturing | Multi-Site Program Project Overview Steinberger Construction has served as a long-term partner to Bayer/Monsanto, supporting a variety of facility upgrades across multiple sites with a consistent focus on safety, equipment reliability, and operational efficiency. At the core of these efforts has been the design and installation of custom […]
Rockland Flooring Expansion

Project Overview Location: Awards: Manhours: Completed: SquareFootage: Design-BuildCollaboration: Safety: More Projects View All Projects