Agricor

Agriculture / Food, Office / Lab | 100,000+ SF | Multi-Phase Renovation | 2019 ABC Award of Excellence

Project

Overview

Steinberger Construction partnered with Agricor Grain Millers on a multi-phase improvement program that transformed over 100,000 square feet of space at their Marion, Indiana facility. With a focus on modernization, compliance, and operational efficiency, each phase of work was designed to elevate both front-end office environments and critical production areas.

The most visible transformation came through the complete renovation of Agricor’s main office, including a standing-seam metal roof system, enhanced building envelope, and a contemporary façade to increase weather resistance and curb appeal. Inside, Steinberger reimagined the workspace with a modern layout, upgraded finishes, and improved lighting and HVAC—all built to support staff productivity, morale, and long-term comfort.

Additional work was completed in highly regulated processing zones, where Steinberger delivered cleanroom-style environments that met USDA food-grade specifications without halting the client’s round-the-clock operations.

Location:

Marion, IN

Awards:

2019 ABC Award of Excellence recipient

Square
Footage:

Over 100,000 SF of facility upgrades across multiple project phases

Highlights:

Full renovation of main office building with new standing-seam metal roof and façade

Interior redesign for employee comfort, workflow, and aesthetics

USDA-compliant processing environments with cleanroom-style construction

Phased delivery to maintain uninterrupted plant operations

Collaboration across administrative and production zones

Safety

First

Executing construction within a live food-processing facility required rigorous safety protocols and scheduling discipline. Steinberger deployed detailed work sequencing, lockout/tagout coordination, and daily oversight to minimize disruption while safeguarding personnel and product integrity. 

Built For

Performance

The Agricor project called for robust design and construction methods that could withstand both environmental exposure and industrial demands. Steinberger integrated performance-grade materials, ergonomic layouts, and food-safe finishes throughout the facility—ensuring compliance, cleanability, and operational longevity.

By coordinating each phase of work around active production and leveraging self-perform capabilities in key trades, Steinberger delivered a seamless transformation of the facility’s administrative and manufacturing environments.

Partnership

In Action

The success of this ongoing partnership with Agricor speaks to Steinberger Construction’s ability to manage complexity, deliver phased improvements with minimal disruption, and tailor every detail to client-specific operational goals. Whether transforming office space or regulated production zones, our team delivered high-performance results that support Agricor’s growth and regulatory readiness for the future.

More

Agriculture & Food

Projects

Agriculture & Food | Warehouse & Logistics
Pre-Engineered Metal Building
Agriculture & Food
Agriculture & Food | Industrial & Manufacturing
Multi-Phase

Build With

Confidence

Desired Services: