Lineage Cold Storage / Hanson Logistics

Agriculture / Food, Warehouse / Logistics | Multi-Facility Program | Phased Delivery

Project

Overview

Steinberger Construction partnered with Hanson Logistics to execute multiple cold storage facility builds across various Lineage Cold Storage locations. These projects supported one of the nation’s leading food supply chain providers, each one engineered to meet strict operational and regulatory demands associated with food-grade warehousing and distribution.

From early-stage planning through final execution, Steinberger led every aspect of delivery—including pre-construction coordination, site-specific engineering, permitting, and construction. The facilities varied in size and layout but were united by a shared standard of excellence in temperature control, cleanliness, and durability.

Each location was carefully phased to accommodate operational continuity, allowing existing logistics operations to continue while new capacity was brought online.

Highlights:

Multi-location cold storage construction program

Delivered for Lineage Cold Storage in partnership with Hanson Logistics

USDA-compliant, temperature-controlled, and cleanroom-style environments

Tailored engineering and layout customization for each facility

Phased construction schedules to support uninterrupted operations

Comprehensive delivery from pre-construction through final turnover

Built to meet strict regulatory, safety, and food-grade performance standards

Safety

First

Constructing within active logistics zones and under strict regulatory oversight required rigorous safety planning. Steinberger implemented hazard-specific safety protocols, coordinated closely with plant personnel, and maintained strict controls for cleanliness, access, and temperature-sensitive materials. All phases were completed without safety compromise.

Built For

Performance

Designed to support sensitive, high-throughput cold storage operations, each facility was equipped with customized HVAC and refrigeration systems, vapor barriers, and durable finishes suitable for food-grade environments. Cleanroom-style construction and USDA-compliant infrastructure ensured sanitary and efficient handling conditions.

By tailoring the design and construction methods to the unique needs of each site, Steinberger delivered cold storage environments that not only met today’s demands but were future-ready in terms of scale and regulatory adaptation.

Partnership

In Action

The success of this multi-site program reflects Steinberger’s ability to partner at scale—bringing deep technical expertise, industry understanding, and construction discipline to the cold storage sector. Through close coordination with Hanson Logistics and Lineage leadership, we delivered high-performance facilities that continue to support critical links in the national food supply chain.

More

Warehouse & Logistics

Projects

Warehouse & Logistics
Pre-Engineered Metal Building
Warehouse & Logistics
Pre-Engineered Metal Building
Industrial & Manufacturing | Warehouse & Logistics
Pre-Engineered Metal Building

Build With

Confidence

Desired Services: